Seven steps
- Requirement — site, style, budget and schedule.
- Design — 3D renders and structure.
- Sample & production — confirm a sample, then fabricate.
- Quality check — welds, dimensions, finish.
- Packing — impact and moisture protection.
- Shipping — nationwide logistics.
- Installation — positioning, fixing and handover.
Typical lead time is 30–60 days; large works may take longer.